04 January 2010

What has THE D-7 crew done lately? (October-December 2009)

October 2009
- Crewmember assisted with youth hunt and collected data from three deer.
Crewmembers collected data from eight deer from meat processors and sportsmen.

-Spread 80 tons of gravel on public parking area on Three-top Mtn. GL.

-Performed routine depot, yard mowing, and site maintenance tasks.

-Mowed 3 miles of road edges on Mitchell River GL.

-Repaired and replaced rear tires on TL90 tractor.
Performed maintenance and repairs on bulldozer.
Performed maintenance and repairs on Truax planter.
Painted temporary bridge components.

-Cleared 1/2 mile of firebreaks on Mitchell River GL.
Reconnoitered layout of firebreaks for future burns on MRGL.
Installed two temporary stream crossings on MRGL firebreaks.

-Removed rocks, stumps and debris from 2 acres of openings on TCGL.
Sprayed 13 acres of openings on TCGL.
Planted 21 acres of openings on TCGL.
Planted four acres of openings on Mitchell River GL.
Removed rocks, stumps and debris from 1.5 acres of openings on MRGL.
Mowed 2 acres of openings on Mitchell River GL.

-Routine office work, purchasing, and reporting.
Crew attended regional meeting in Marion.

-Treated 342 Hemlock trees for Hemlock Wooly Adelgid control as follows:
Treated 32 trees on Buffalo Cove GL
Treated 42 trees on Mitchell River GL
Treated 186 trees on Thurmond Chatham GL
Treated 82 trees on Three Top GL
Jim applying pesticide to control HWA


-Replaced stolen battery bank in tandem and 2-ton dump trucks.

November 2009
-Crewmembers collected data from 212 deer at various meat processors.

-Performed routine depot and site maintenance tasks.
Hauled off trash and recyclables and scrap tires to landfill.
Crewmember met with state fire marshal for depot inspection.

-Repaired washed out culvert on MRGL.

-Maintained various non-highway equipment.

-Constructed 1.3 miles of firelanes on MRGL.

-Reviewed burn plans with regional forester and prepared burn plans.

-Routine office work, purchasing, and reporting.

-Maintained and inspected dump trucks and 10 & 20 ton trailers.
Maintained pumper unit truck (PM3579).

-Crewmember hauled Huntmaster trailer back to depot from Morganton depot.
Prepared, demonstrated, and signed out Huntmaster for NWTF handicap hunt.

December 2009
-Crewmembers collected data from 235 deer at various meat processors.

-Performed routine depot and site maintenance tasks.
Repaired depot security lighting system.
Plowed snow to provide access to depot.

-Repaired and performed scheduled maintenance on three tractors.
Repaired and maintained Alamo mower.
Repaired and maintained depot air compressor.
Repaired and maintained Honda ATV.

-Constructed temporary bridges needed for firelanes.

-Inspected, cleaned, and maintained 30 wood duck nest boxes at Hunting Creek waterfowl refuge.

-Inspected tracts to be burned on Perkins and MRGL, and prepared burn plans.

-Crewleader attended regional meeting at Marion depot.
Crew completed mandatory training regarding e-mail policies.
Routine office work and preparing reports.

-Had pumper unit truck inspected (PM3579).

-Prepared, demonstrated, and signed out Huntmaster for two handicapped hunts.